You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Every time it rains this puddle appears and is a hazard

Reported via desktop in the Other damage to pavement i.e. cobbles, raised mound/surface category anonymously at 14:01, Wed 3 September 2025

Sent to Gloucestershire County Council less than a minute later. FixMyStreet ref: 8113658.

There is no local drain at the end of the cul de sac, water has to run down the road and over the camber. It has been reported before and apparantly fixed but not sure what was done, enquiry 11388753. The problem is worse in colder temperatures when freezing as this is a slip hazard for pedestrians. My view is that a drain should be installed at the end of the cul e sac or raise the road covering to provide a slope.

Updates

  • Thank you for reporting this issue. It has now been logged.

    Should the issue pose an immediate danger to public safety such as:-
    •Objects on the highway network (i.e. a fallen tree)
    •Faulty temporary or permanent traffic lights (i.e. stuck on red)
    •Exposed cables
    •Multiple street lighting faults
    •Flooded roads
    •Potholes over 75mm deep •Manhole/Metal Cover (i.e. missing or dangerous) please call our emergency number 08000 514 514.

    We will provide you with an update within ten working days, however, our aim is to keep you informed of progress within five working days, whenever possible.
    Highways Customer Services Team Gloucestershire Highways

    Posted by Gloucestershire County Council at 14:02, Wed 3 September 2025

  • This report has now been passed to the Highways team for assessment.

    If repair work is required, it will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the issue will be provided.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,

    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 12:00, Thu 4 September 2025

  • State changed to: Open

    Updated by Gloucestershire County Council at 14:32, Tue 16 September 2025

  • This report has now been passed to the Highways team for assessment.

    If repair work is required, it will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the issue will be provided.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,

    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 12:39, Wed 3 December 2025

  • This enquiry has been addressed, no further updates will be shared here. If you are the original reporter you should have received a seperate communication with more detail.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Closed

    Posted by Gloucestershire County Council at 15:07, Tue 9 December 2025

If the issue is still ongoing, you can make a new report in the same location.