You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

There are still two huge potholes around the drains near the corner of Coldicott Leys. These are full of filthy water which flows down the main road from the edge of the driveway to “Little Gidding” Rhodri has been out and inspected this. At the beginning of April, Highways put barriers around them and I was told that they would look at redirecting the spring water under the road into the existing drain network. These potholes have been patched several times in the past but this does not last because of the constantly flowing spring water. The front of my house and anyone in the front garden was getting soaked when cars hit the pothole until the barriers were erected. There are health and safety issues here and in the past couple of years two villagers have been injured during icy weather when the water freezes, one having concussion and one needing an ambulance. The issue with the spring needs addressing as a matter of urgency.

Reported via iOS in the A pothole in road category anonymously at 12:22, Mon 7 July 2025

Sent to Gloucestershire County Council less than a minute later. FixMyStreet ref: 7820788.

On the corner of the main road with Coldicott Leys.

Updates

  • Thank you for reporting a pothole.

    First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will provide updates about this report.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.

    Thank you again for taking the time to report this issue.

    Highways Customer Services Team,
    Gloucestershire Highways

    Posted by Gloucestershire County Council at 12:22, Mon 7 July 2025

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 11:14, Tue 8 July 2025

  • This enquiry has been addressed, no further updates will be shared here. If you are the original reporter you should have received a seperate communication with more detail.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Closed

    Posted by Gloucestershire County Council at 12:37, Fri 7 November 2025

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 12:44, Fri 7 November 2025

  • This enquiry has been addressed, no further updates will be shared here. If you are the original reporter you should have received a seperate communication with more detail.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Closed

    Posted by Gloucestershire County Council at 12:44, Fri 7 November 2025

If the issue is still ongoing, you can make a new report in the same location.